Reprocess of a queued/processing/failed upload now sources from verified staging instead of the not-yet-written final original, which used to supersede v1 and strand the attachment in queued. PNG uploads now inflate the concatenated IDAT stream (bounded by IHDR dimensions) before acceptance, so a structurally valid PNG whose IDAT is not a zlib stream is rejected with 415 instead of 202.
Concurrent complete no longer deletes the shared verified source; admission is atomic and covers pending presign rows; relay reconciles queued jobs lost to dead-lettering; failed staging is protected until failed_retention; timestamps normalized to UTC; reprocess prefers the durable original and keeps job->attachment lock order; heartbeat errors no longer burn attempts; confirm timeout enforced; pinned images and sanitized health responses.
API принимает 202 после durable staging и TX intent (job+outbox); отдельные relay и worker публикуют/обрабатывают задания с publisher confirm, lease, retry/backoff, DLQ и replay. Добавлены версии pipeline, варианты thumbnail/crop/optimized, presign в verified staging, status-aware sweeper и admission control.